The lake’s annual cycle nears its conclusion, as the drawdown continues.
The lake’s annual cycle nears its conclusion, as the drawdown continues.
A few months following the completion of the dam reconstruction project, a visit to the site already reveals a sense of longevity and permanence.
As of May 11, the lake level is only 9″ below summer level, and going up.
The long process of replacing the Ossipee Lake Dam is over. In Tim Otterbach’s latest pictures, we see a magnificent structure in winter repose, but ready for use.
We are about five weeks from the lake being iced-over. But so far, only the dog’s outdoor water bowl shows signs of the approaching winter.